Tampa Airport Airside E Cooling Tower Refurbishment – Phase 2, Lakeland, FL

Hillsborough County

Owner Reference: 08222024RW-0-2024/RW

Bid Date: 10/03/2024 at 02:00pm
13 Days until bid date

Trades: CGC - *General Engineering Contractor GEC; Subcontractor Opportunities, Evaporative Cooling Contractor

The components associated with the cooling towers serving Airside E have reached the end of their useful life and require refurbishment. The Phase 2 scope of work includes the removal and replacement of piping, manual and equalizing valves, control valves, and piping accessories such as vibrations compensation, temperature and pressure sensors, and mitigating plume entrainment by adding intake louvers.

Rianner Woodard
 Login or create an account
 Login or create an account

Owner: County of Hillsborough FL

Published 08/19/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.