Design and Construction of 259 S. Pine Stormwater Basin, Fellsmere, FL

Indian River County

Owner Reference: 2024-10

Bid Date: 09/03/2024 at 02:00pm

Pre-Bid: 08/06/2024 @ 02:00pm

Trades: Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, Stormwater Pollution Prevention Plan (SWPP) - Regional Flood Planning Group (RFPG) - Flood Risk Reduction Plans, CG - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

The project entails constructing a modern stormwater management system for South Pine Street between Massachusetts Avenue and 89th Street, an approximate 4-acre drainage basin. The proposed stormwater management system will include storage and treatment of stormwater runoff within the basin through a series of swales, piping, retention area and overflow structure for discharge to the drainage conveyance system. The treatment system will meet or exceed SJRWMD standards for new construction. This basin was selected over others due to its known deficiencies and the presence of a city-owned lot for use as a retention area.

Laura Hammer
 Login or create an account
 Login or create an account

Owner: City of Fellsmere FL

Published 08/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.