Marianna Wastewater Facilities Generators & Hardening, Marianna, FL

Jackson County

Owner Reference: 4399-110-R

Bid Date: 09/24/2024 at 02:00pm
7 Days until bid date

Pre-Bid: 09/10/2024 @ 10:00am

Trades: CGC - *General Engineering Contractor GEC; Subcontractor Opportunities

The City of Marianna proposes to harden and strengthen the resiliency of the City’s wastewater collection and transmission system by implementing the following hazard mitigation strategy: PART A: (1) Flood proof and install an emergency generator at the Hillcrest Sewer Lift Station, (2) Install 7 permanent emergency generators and SCADA at 7 sewer lift stations sites, (3) Perform Road Improvements at West Manor lift station, (4) Harden Marianna’s Wastewater Treatment Plant (WWTP) against wind-blown storm debris; to include replacement of existing PVC reuse piping with stainless steel piping at plant headworks. PART B: Provide two (2) trailer-mounted diesel 100kW generators and two (2) trailer-mounted diesel 35kW generators or an alternate two (2) trailer-mounted diesel 60kW generators. T

Marti Vickery, c/o Melvin Engineering
 Login or create an account
 Login or create an account

Owner: City of Marianna FL

Published 08/27/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.