Southside Triangle – Water and Sewer Improvements Phase I, Tallahassee, FL

Leon County

Owner Reference: 042-25-RM

Bid Date: 04/01/2025 at 02:30pm
16 Days until bid date

Pre-Bid: 03/05/2025 @ 02:00pm

Trades: CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF)

Southside Triangle Phase I includes water and sewer extensions into 5 sub-project areas. Those sub-project areas include: Hannon Mill Rd, constructing 2,400 lf of sewer main and 2,160 lf of water main; Ponce de Leon Blvd., constructing 1,500 lf of sewer main and 35 lf of water main; Crossway Rd E., constructing 2,350 lf of sewer main and 15 lf of water main; Shelfer Rd, constructing 70 lf of sewer main and 25 lf of water main; and Crawfordville Road, including areas within the Crawfordville Road (FDOT) R/W, constructing 60 lf of sewer main and 235 lf of water main. All project areas will have a pavement restoration component, and most will water and sewer services to install. Bonds required. Prevailing wages.

Ron Mayo
 Login or create an account
 Login or create an account

Owner: City of Tallahassee FL

Published 02/24/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450