ID 719748
Marion County
Owner Reference: ENG/240466
Bid Date: 09/25/2024 at 02:00pm
8 Days until bid date
Trades: CGC - *General Engineering Contractor GEC; Subcontractor Opportunities
The project described in this RFP is for the total design and sequential construction of the remaining phases of the City’s conceptual plan for the Ocala Skate Park which includes an intermediate bowl (Phase B), a snake run (Phase C), a large bowl (Phase D), and a 4,000 square foot beginners’ area (Phase E). See Exhibit A – Design Criteria for additional details. The Scope of Services includes design, landscape architecture, civil engineering, and all supporting disciplines required to provide a design and complete set of construction plans and specifications. The successful Design-Build Team will be responsible for constructing and managing the Project to completion. Bonds required.
Eileen Marquez
Login or create an account
Login or create an account
Owner: City of Ocala FL
Published 08/27/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450