**NEW BID DATE: Sunset Islands 2 to 3 Force Main and Water Main Replacement, Miami Beach, FL

Miami-Dade County

Owner Reference: ITB 2024-481-JP

Bid Date: 09/20/2024 at 03:00pm
3 Days until bid date

Pre-Bid: 08/09/2024 @ 10:30am

Estimate: $3,400,000

Trades: CGC - *General Engineering Contractor GEC; Subcontractor Opportunities, CU - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

The purpose of this project is the replacement and relocation of an existing 8-inch force main owned by the City of Miami Beach (City) as well as a section of an existing 8-inch water main. This project aims to replace the existing force main subaqueous canal crossing, which has experienced several failures in the recent past, leading to sanitary sewer discharge to the waterway, and whose current condition poses an environmental risk. Therefore, it is the intent of the City to replace the canal crossing with a Horizontal Directional Drilling (HDD) installation in a more suitable location that will also provide more durable materials to reduce the risks of pipeline failure in the future. The pipeline to be replaced is located along Sunset Islands 2 and 3 and includes a subaqueous crossing under the Sunset Lake through an existing utility easement located between W 24th Street and W 25th Street. The force main section to be replaced spans between the discharge of PS-13, located on Sunset Drive at the south end of Sunset Island 3, and the point of connection of PS-14 on Sunset Drive at the north end of Sunset Island 2. Similarly, the water main section to be replaced spans between the South end of Sunset Island 3 and the North end of Sunset Island 2, including a subaqueous crossing under Sunset Lake through the existing utility easement. In accordance with recommendations in the City’s Water Master Plan and Sewer Master Plan, the scope of this project includes the installation of approximately 1,300 linear feet (LF) of a subaqueous 12-inch inside diameter (ID) High-Density Polyethylene (HDPE) force main via Horizontal Directional Drilling (HDD) and the installation of approximately 725 LF of a subaqueous 10-inch HDPE water main via Horizontal Directional Drilling (HDD). Bonds required.

Julissa Perez
 Login or create an account
 Login or create an account

Owner: City of Miami Beach FL

Published 08/14/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.