3B Electric Vehicle Charging Stations, Miami, FL

Miami-Dade County

Owner Reference: MCC 7360 RPQ 18578-24

Bid Date: 09/20/2024 at 02:00pm
3 Days until bid date

Pre-Bid: 08/29/2024 @ 10:00am

Estimate: $357,898

Trades: CGC - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities, CGC - *General Engineering Contractor GEC; Subcontractor Opportunities, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, Structural Steel & Steel Erection Contractor, Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, CU - Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Terminal Charging Infrastructure: Electric Vehicle (EV); Battery Electric Bus (BEB) & Zero Emissions Vessels (ZEV) or Ferries

Labor, equipment and materials to furnish and install five Dual Port Electric Vehicle Chargers as per specifications and plans. Bonds required.

Humberto Contreras
 Login or create an account

Owner: County of Miami-Dade FL

Published 08/19/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.