RFP Thermoplastic Roofing Application at Daisy & Rosa, Hialeah, FL

Miami-Dade County

Owner Reference: QSP- Thermoplastic Roofing Application

Bid Date: 10/09/2024 at 11:00am
19 Days until bid date

Pre-Bid: 09/25/2024 @ 10:30am

Trades: CC - Roofing Contractor, Facia Board & Soffit Replacement: General Building Contractor

• Power wash entire roof and parapet walls to remove all loose granules and debris in order to achieve a clean workable roof surface. • Contractor shall haul away all trash and debris generated by scope of work. • Contractor should repair and seal all existing blisters. • All flashings including roof curbs, parapet walls shall receive the specified product as pe manufacturer's application requirements. • All specified GAF materials shall be applied as per Manufacturer's guidelines and specifications. • Provide a minimum of 5 year warranty in labor and 20 year material manufacturer warranty. • Contractor shall furnish a detailed schedule of work to be performed to the Hialeah Housing Authority once a Notice to proceed has been issued. • Upon commencing any work, Contractor will be responsible to visit the job site and become familiar with the existing conditions of the building, including, but not limited to access routes, parking, delivery, and storage areas. If any conditions deviate from the overall scope of work, Contractor shall notify the HHA in writing within 7 calendar days prior to commencing work. • Contractor shall provide all labor, materials, equipment required to perform and complete the scope of work as specified by HHA and material manufacturer in a work like manner. • If Applicable, contractor shall acquire all necessary permits, pay all permit fees and pass all required inspections from the Building Department and/or the Hialeah Housing Authority. Contractor solely responsible to verify with City of Hialeah building department if any permit will be required for the scope to be completed. • All construction to be in accordance with all applicable local current codes and ordinances and the Florida Building Codes. • Contractor shall be responsible to properly secure and protect the construction site from theft, vandalism and possible work related damages to both existing structure and new construction. All path-up work performed shall match existing. • Contractors shall provide a safe working environment and comply, at a minimum, with OSHA standards to reduce and/or eliminate possible work related accidents. • Contractor shall be responsible to protect and safe guard against damages to all vehicles and landscape. If special arrangements need to be made, the Contractor shall notify the H.H.A. in writing within 7 working days prior to commencing work. • Contractor is responsible to keep the job site free from accumulation of waste materialand rubbish. Before the end of each working day, the Contractor shall inspect and clean-up any debris from the work area. Contractor shall remove and discard all construction debris from site at the completion of the scope of work specified and prior to the final inspection. • All work is subject to inspection by the Contracting Officer, Site Manager, Site Foreman, Maintenance Supervisor, and/or their appointee. They may require the Contractor to correct any defective workmanship or to replace any defective materials with no further cost to HHA, within 2-business days of notification of deficiency. • The Hialeah Housing Authority reserves the right to disqualify and/or terminate any Contractor at any time that does not meet all of the Hialeah Housing Authority's criteria and/or does not follow the specifications. Bonds required. Prevailing wages.

Miguel Hernandez
 Login or create an account
 Login or create an account

Owner: Hialeah Housing Authority FL

Published 09/11/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.