**Updated** New Bid Date: Northwest Water Reclamation Facility Package 1 Clarifiers #1-#4, WAS, Meter & Lab Improvements, Orange, FL

Orange County

Owner Reference: Y25-724

Bid Date: 01/07/2025 at 04:00pm
16 Days until bid date

Pre-Bid: 11/06/2024 @ 01:00pm

Estimate: $7,213,000.00

Trades: CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station

The improvements include new clarifier mechanisms and structures for Clarifiers #1-#4, installing a WAS flow control assemble for Clarifiers #1 and #2, replacing the BNR influent isolation and control valve, and improvements to the existing laboratory within the Operations and Maintenance building. Bonds required.

Corie Cummings
 Login or create an account
 Login or create an account

Owner: County of Orange FL

Published 10/30/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450