EAA Canal Conveyance Improvements, Miami Canal, West Palm Beach, FL

Palm Beach County

Owner Reference: 6000001536-0-2024/EF

Bid Date: 10/22/2024 at 02:30pm

Pre-Bid: 09/10/2024 @ 10:30am

Trades: Dredging Contractor: Water Excavation - General Engineering Contractor

The goal of the project is to increase conveyance of the Miami Canal by 1000 cubic feet per second (cfs) above existing capacity while keeping water levels and flow velocities within specified limits. The conveyance will be increased by excavating material from the bottom and sides of the canal along the identified canal segments and depositing the spoil within the canal right-of-way (ROW) and/or removed to a near-by off-site Dredge Material Management Area (DMMA) location referred to as the Lake Harbor Tract.

Elizabeth Frank
 Login or create an account
 Login or create an account

Owner: South Florida Water Management District (SFWMD) FL

Published 08/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.