West Pine Street Water Main Improvement Phase 2, Lantana, FL

Palm Beach County

Owner Reference: 2025-02-PS-0-2025/JD

Bid Date: 03/27/2025 at 02:00pm
12 Days until bid date

Pre-Bid: 03/07/2025 @ 02:00pm

Trades: CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, CU - Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras

The Work to be performed under this Contract shall include, but is not limited to, the Installation of water mains within the project area, West Pine Street between I-95 and South Arnold Avenue. Bonds required.

Jerry Darr
 Login or create an account
 Login or create an account

Owner: Town of Lantana FL

Published 02/21/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.