Virginia Street Water Main Replacement, Dunedin, FL

Pinellas County

Owner Reference: 25-2511-0-2025/TWS

Bid Date: 03/18/2025 at 02:30pm
3 Days until bid date

Pre-Bid: 02/19/2025 @ 10:00am

Estimate: $1,326,655.00

Trades: CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, CU - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Pipe Inspection Camera

The work generally consists of the following: The replacement of the 12” existing water main along Virginia Street from the intersection of Lake Haven Road to the intersection of Keene Road. The water main will replace approximately 2,010 LF with PVC and CERTA-LOK PVC. Replacements will also consist of new connections to existing side street water mains on Peggy Ray Drive, Aberdeen Oaks Dr., and Treemont Way, grout filling existing pipelines, sodding, sidewalk repairs, mill and resurfacing, and pavement full-depth road restoration. Additionally, the project involves the installation of an 8” water main stub out and fire hydrant assembly at Knollwood Drive. Bonds required.

Tammy Spearman
 Login or create an account
 Login or create an account

Owner: City of Dunedin FL

Published 02/04/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.