CBS ID: 744278
Pinellas County
Owner Reference: 08-25
Bid Date: 03/19/2025 at 10:00am
4 Days until bid date
Trades: *A&E Architecture, Engineering Services & Design: Professional, Consultant, EOR Services & Consulting
The City of Clearwater is soliciting responses from qualified engineering consulting firms to assist with its implementation of a Florida Senate Bill 64 Plan. The City owns and operates three (3) water reclamation facilities (WRFs); East WRF, Marshall Street WRF, and Northeast WRF. The East WRF’s permitted capacity is 5.0 million gallons per day (MGD) annual average daily flow (AADF) and functions as a Type I domestic advanced wastewater treatment facility (AWWTF). The Marshall Street WRF has a permitted capacity of 10.0 MGD AADF Type I domestic AWWTF. The Northeast WRF’s permitted capacity is 13.5 MGD AADF and serves both the City of Clearwater and the City of Safety Harbor as a Type I domestic AWWTF.
Lori Vogel
Login or create an account
Login or create an account
Owner: City of Clearwater FL
Published 02/16/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.