North Santa Rosa Regional Water Reclamation Facility, Milton, FL

Santa Rosa County

Owner Reference: 2024-09

Bid Date: 10/09/2024 at 02:00pm
19 Days until bid date

Pre-Bid: 09/11/2024 @ 09:00am

Trades: CGC - *General Engineering Contractor GEC; Subcontractor Opportunities, Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor

The Project consists of the following: Construction of a 2.0 MGD Biological Nutrient Removal Plant including rerouting of collection system to plant site, construction of an on-site master lift station, screening and grit removal, equalization basin, Aeromod Biological Nutrient Removal and clarification, filtration, chlorination, pumping system, yard piping, stormwater, maintenance/operations facility, and all ancillary equipment necessary for a complete and operational facility. Bonds required.

Michelle Williams, via email only
 Login or create an account
 Login or create an account

Owner: City of Milton FL

Published 09/05/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450