SWRC Blower Package, Sanford, FL

Seminole County

Owner Reference: 23/24-313

Bid Date: 09/25/2024 at 02:00pm
6 Days until bid date

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Ozonator: Ozone Generator & System Installation & Repair

Bidder shall provide all necessary material, goods, labor, etcetera to application: 850 SCFM @ 7.5 psig, PRV set at 8.5 psig. Wastewater Aeration System Blower Selection: Tuthill Model # 4512-A4L2CV6-A-X Equalizer Model DF Blower or equivalent unit the blower will need to have a splash lubrication, operating at 3,326 RPM, 83% of max BHP at operating conditions is 39 and a discharge temperature of 188-degree Fahrenheit

Purchasing Department
 Login or create an account
 Login or create an account

Owner: City of Sanford FL

Published 09/07/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.