Butler Part West Improvements - Phase I, St. Augustine, FL

St. Johns County

Owner Reference: SB-1956-0-2024/DF

Bid Date: 09/04/2024 at 02:00pm

Trades: CG - *General Engineering Contractor GEC; Subcontractor Opportunities, Marine Boat Dock Construction: Wharf, Berths, Pile Moorings, Boardwalks, Hardware, Supports, Pier Parts & Repair, Dredging Contractor: Water Excavation - General Engineering Contractor, Hydrologics: Groundwater Monitoring, Flow Analysis and Modeling

The scope of work for this project generally includes provision of all labor, materials, equipment, and transportation necessary to construct improvements at the Butler Park West Boat Ramp, including dredging the boat ramp channel, delineation of lanes on the existing boat ramp, demolition of the existing floating dock and gangway, and providing and installing a new floating dock and gangway. Bonds required.

Diana Fye
 Login or create an account
 Login or create an account

Owner: County of St. Johns FL

Published 08/07/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.