Water & Sewer Improvement Becker Road Corridor - Phase II, Port St. Lucie, FL

St. Lucie County

Owner Reference: 20240136

Bid Date: 10/01/2024 at 03:00pm
11 Days until bid date

Trades: CGC - *General Engineering Contractor GEC; Subcontractor Opportunities, CU - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

The Project entails the installation of approximately 280 linear feet of new 4-inch water main installed via open cut, 1,600 linear feet of new 6-inch water main via open cut, and 7,800 linear feet of new 2-inch low-pressure force main installed via horizontal direction drill along Becker Road. The project starts east of the I-95/Becker Road interchange and ends approximately 700 LF east of the Becker Road/Bradshaw Circle intersection. There are seven sections of low-pressure force main sections installed as part of this project, completing the low-pressure collection system on the north side of Becker Road. This project is to include all fittings, valves, appurtenances, and pipe associated with the installation of the HDPE horizontal directional drill in addition to all fittings, valves, appurtenances, and pipe associated with the open-cut installation of the C-900 PVC water main, pipe installed via horizontal directional drill, connections to the existing water mains, and obtaining of any required permits. Bonds required.

Keith Stewart
 Login or create an account
 Login or create an account

Owner: City of Port St. Lucie FL

Published 09/03/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.