PLC Replacement Program Phase 2 Work, Naples, FL

Sumter County

Owner Reference: 24B-044

Bid Date: 10/11/2024 at 03:00pm
21 Days until bid date

Pre-Bid: 09/24/2024 @ 09:00am

Trades: CGC - *General Engineering Contractor GEC; Subcontractor Opportunities, Low Voltage Electrical Contractor (LVE): Residential Wiring, Telephone/Sound/Cable TV Systems, Fiberoptic, Fiber Optic, Ethernet, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers

The Villages Community Development Districts are requesting bids for the PLC Replacement Program Phase 2 Work. Qualified firms wishing to respond for “ITB #24B-044 PLC Replacement Program Phase 2 Work” must provide all equipment, labor and materials described in this document, whether directly or through sub-contractors/sub-consultants. This does not, however, limit the use of subcontractors or subconsultants. The intent of this ITB is to procure a qualified, professional licensed Contractor that has completed at least five control panel installation or upgrade projects within the last 5 years and has 8 years of overall experience performing PLC/PAC control panel upgrades or installation of new PLC/PAC control panels. This project phase of work includes, but is not limited to; engineering and submittals, PLC & OIT programming, hardware and software factory acceptance testing, replacement of four (4) existing PLC panels, four (4) existing PLC backplate panels, electrical conduit and cable installation, field testing, commissioning, and training within the existing water, wastewater, and remote facilities. Bonds required.

Susi Belon
 Login or create an account
 Login or create an account

Owner: The Village Community Development Districts FL

Published 09/13/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.