ID 735040
Sumter County
Owner Reference: 2025-01-0-2025/RS
Bid Date: 01/21/2025 at 11:00am
30 Days until bid date
Pre-Bid: 01/09/2025 @ 11:00am
Trades: CGC - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Road Improvements: Parking & Highway Improvements - NAICS 237310
Roadway improvements, construction of drainage structures and pipes, and a storm pump station. The roadway improvements consist of mill and resurface 190 ft of E. Live Oak St., and 56 ft of Village Dr. The new drainage structures and pipes will run on E. Live Oak St and tie into the new storm pump station. This pump station is located on parcel G07F011 and will tie into an existing 6” storm force main. Coordination with the City of Wildwood Public Works Department is required to use and install some available equipment in store for the pump station.
Robert Schoepe, via email only
Login or create an account
Login or create an account
Owner: City of Wildwood FL
Published 12/16/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.