Potable Water Line Improvements, Live Oak, FL

Suwannee County

Owner Reference: 03‐2024

Bid Date: 09/19/2024 at 03:00pm
2 Days until bid date

Pre-Bid: 08/27/2024 @ 11:00am

Trades: CGC - *General Engineering Contractor GEC; Subcontractor Opportunities, CU - Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

Replacing existing undersized water mains with six-inch PVC water mains in two separate project areas. The first project area includes work on Main Street from Lee Avenue to Jackson Avenue and Ruby Street from Jackson Avenue to Ingleside Drive. The second project area includes work on Louis Avenue and Richardson Avenue from 8th Street to 6th Street and Lincoln Avenue and Taylor Avenue from Douglas street to 7th Street. The work includes the abandonment of existing water main, the installation of water main, installation of fire hydrants, tapping existing water mains, reconnecting water services and site/pavement restoration.

Doris McCury
 Login or create an account
 Login or create an account

Owner: City of Live Oak FL

Published 08/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.