ID 716756
Volusia County
Owner Reference: ITB 24-WW-07
Bid Date: 09/05/2024 at 02:00pm
Pre-Bid: 08/13/2024 @ 01:00pm
Trades: CG - *General Engineering Contractor GEC; Subcontractor Opportunities, CU - Pipeline Contractor: Water Mains, Sewer Lines, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera
Installation of approximately 1,700 LF of 4” force main by directional drill. Installation of piping for a bypass pump at Lift Station 17 and provision of the bypass pump. Bonds required.
Steve Juengst
Login or create an account
Owner: City of Holly Hill FL
Published 08/06/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.