Riverside Park Bulkhead Replacement, Holly Hill, FL

Volusia County

Owner Reference: 22-BG-10

Bid Date: 12/17/2024 at 10:00am
13 Days until bid date

Pre-Bid: 12/03/2024 @ 10:00am

Trades: CGC - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47

Replacement of a 200 linear feet bulkhead at Riverside Park, located at 231 Riverside Drive, Holly Hill, Florida 32117. Work will include a reinforced concrete cap, composite sheet piles and a helical anchor system.

Michele Moore
 Login or create an account
 Login or create an account

Owner: City of Holly Hill FL

Published 11/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.