Wildwood Phase I Construction and Wakulla Middle School Wastewater Treatment Plant Decommissioning, Crawfordville, FL

Wakulla County

Owner Reference: 2024-68

Bid Date: 12/17/2024 at 04:00pm

Pre-Bid: 11/21/2024 @ 10:00am

Estimate: Wildwood Phase I is $1,595,061.00. • Wakulla Middle School Waste Water Treatment Plant Decommissioning is $535,371.00

Trades: CGC - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors, Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, Wastewater Treatment Plant Construction & Repairs WWTP/WRF/OSSF OnSite Sewer Facilities Lift Station

The first is located in Wakulla County, Florida, and includes the first phase of construction of a gravity sewer system servicing the residential area known as Wildwood. Wildwood Septic-to-Sewer Phase I is located on Wildwood Drive approximately 1.7 miles east of the intersection of Coastal Highway and US 319. This phase will include construction of a duplex sanitary lift station, approximately 4,969 LF of 8” gravity sewer, 20 manholes, 550 LF of 6” force main, 430 LF of 4” force main, and service to approximately 29 existing homes and 2 vacant parcels. The 6” force main will connect to an existing 20” PVC force main on the south side of Coastal Highway via a hot-tap. Work at existing homes will be a complete plumbing connection and demolition of existing septic tanks per Health Department rules. Restoration work will include paving impacted roads per FDOT Specifications, drainage improvements, and complete restoration of impacted areas within the project site. • The second project is located in Wakulla County, Florida, and includes the decommissioning of Wakulla Middle School Waste Water Treatment Plant (WWTP). The school will be connected to the gravity sewer collection system rendering the WWTP unnecessary. Structures on the site will be demolished and backfilled per the plans and the site will be restored by grading and sodding. The contractor shall be prepared to meet requirements for construction work on school property. Bonds required. Prevailing wages.

Patty Taylor
 Login or create an account
 Login or create an account

Owner: County of Wakulla FL

Published 11/18/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450