Ridgecrest Golf Course Irrigation project, Nampa, ID

Canyon County

Owner Reference: 25-6070-008 REBID

Bid Date: 11/13/2024 at 11:00am

Pre-Bid: 11/04/2024 @ 10:00am

Trades: PWC - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Water Supply & Irrigation Contractor: Reverse Osmosis (RO) Systems, Landscaping Water Sprinkler System

The scope is to install a new supplemental irrigation well and well pumping system at the Ridgecrest Golf Course. The well will be 16-inch diameter, steel cased, approximately 450 feet deep with stainless steel screens and capable of 1,650 gpm. The well pump is anticipated to be a 100 hp vertical turbine line shaft with 275 feet of buried 12-inch pipeline to an open-air discharge into an irrigation pond. Pump control will be by VFD, and pond level as measured in the existing wet well. A new electric power transformer and power cable upgrade is needed for the source.

Cody Swander
 Login or create an account
 Login or create an account

Owner: City of Nampa ID

Published 10/26/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.