CBS ID: 739312
Nez Perce County
Owner Reference: 24765
Bid Date: 02/20/2025 at 05:00pm
5 Days until bid date
Pre-Bid: 01/16/2025 @ 01:00pm
Estimate: $3,000,000
Trades: Design/Build Contractor; Design/Bid/Build Entity (DBBE), Terminal Charging: Electric Vehicle Charging Stations (EVCS); Battery Electric Bus (BEB) & Zero Emissions Vessels (ZEV) or Ferri
This Request for Qualifications (RFQ) is issued by the Idaho Transportation Department (Department) to seek Statements of Qualifications (SOQ) for the National Electric Vehicle Infrastructure Program (NEVI Program or Program). SOQs will be accepted only from Applicants that have assembled a team capable of providing all services and improvements required by the Project. Generally, the Work will consist of the following: Construct or upgrade existing DCFC EV charging stations in Lewiston, Bliss and Pocatello that conform to the minimum standards of 23 CFR § 680 and other applicable federal, state, and local requirements. Applicants must operate and maintain stations for at least five (5) years following station commissioning. Applicants should consider upgrading existing EVSE infrastructure to compliance with the NEVI minimum standards at 23 CFR § 680. All Sites shall be DCFC with a minimum of four ports with a minimum power of 150 kW per port. Each Site must be located within a one-mile travel distance from an Interstate Highway System exit or highway intersection on an AFC listed in Table 1, as indicated in the highlighted portions of Figures 1, 2, and 3 and shown in more detail at this link https://tinyurl.com/h83c6c2v. The approximate cost of each Project is $1,000,000. Actual costs will be provided by the Applicant in response to the RFA. NEVI Developers will be required to provide at least 20% of eligible costs. The Program will provide up to 80% eligible costs. Applicants will provide a separate price proposal in the RFA process. The technical score and price proposal will be considered together to determine the best value Applicant. The desired operational date timeline of each Project is within 12 months of the Contract Award. Selected Applicants will provide a project schedule with their Applications in response to the RFA. Prevailing wages.
Merrill Sharp
Login or create an account
Login or create an account
Owner: State of Idaho Department of Transportation (IDDOT/ITD) ID
Published 01/18/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.