ID 724746
Shoshone County
Bid Date: 10/24/2024 at 02:00pm
Trades: PWC - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
For the work of replacing a single-span, two-lane bridge crossing the South Fork Coeur d’Alene River, located on Fifth Street in the City of Mullan, Idaho. The existing bridge with bituminous surface is 34 feet long and 29 feet wide curb to curb, constructed in 1972. The new structure will be a 54 foot-long single span prestressed voided slab bridge with Combination Pedestrian & Traffic Rail, waterproofing membrane, HMA overlay, and shallow abutments placed on pile. The Work will not start earlier than April 1st, 2025, or later than May 1st, 2025, and must be substantially completed within 90 working days from beginning contract work.
Purchasing
Login or create an account
Owner: Local Highway Technical Assistance Council (LHTAC) ID
Published 10/02/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.