Mission St CRABS, Idaho St to SH-55 Project, McCall, ID

Valley County

Owner Reference: ITB

Bid Date: 11/21/2024 at 10:00am
Bids Today

Pre-Bid: 10/31/2024 @ 10:00am

Trades: PWC - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera

The work of this contract generally includes roadway improvements on Mission Street from Idaho Street to SH-55. The roadway improvements include cement recycled asphalt base stabilization (CRABS) pavement rehabilitation of the existing roadway and widening of the road section for bike lanes. Additional roadwork includes installation of stormwater inlets and piping, driveway culverts, drainage ditches, retaining walls, striping, and traffic signs. The project also includes replacement of water services, water meters, and fire hydrants. Bonds required.

Tyson Larson
 Login or create an account
 Login or create an account

Owner: City of McCall ID

Published 11/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.