Wastewater Treatment Plant-Phase 1, Oglesby IL

Bureau County

Bid Date: 04/17/2025 at 10:00am
1 Days until bid date

Pre-Bid: 03/20/2025 @ 10:00am

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

The Phase 1 construction of a new wastewater treatment plant for the City of Oglesby, Illinois to be located on the site of their existing facilities off California/Field Avenue. • Construction of new sanitary sewer piping • Construction of a headworks building with raw sewage screening equipment, grit removal • Construction of a pumping/disinfection building • Construction of a secondary treatment process with clarifiers • Construction of a blower building and electrical room • Construction of a laboratory • All associated site work, roadways, piping, electrical, water service, gas service, etc. as necessary to provide a complete and fully operational wastewater treatment facility. Bonds required. Prevailing wages.

Ross T Baker
 Login or create an account
 Login or create an account

Owner: Chamlin & Associates Peru IL

Published 03/10/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450