Storm Sewer Pipe Replacement and Channel Excavation on IL 127, Jackson County, IL

Jackson County

Owner Reference: 78A59

Bid Date: 01/17/2025 at 12:00pm
26 Days until bid date

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Tree Service Contractor: Trimming/Pruning Trees, Stump & Tree Removal/Rooting/Grinding, Reservoirs, Lakes, Streams, Ponds, Channels, Water Barriers, Aquatic Plants, Wetland Restoration, Living Shorelines NAICS 562998, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor, Roadway Drainage, Stormwater, Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Underdrains, Dewatering, Water Swales

This project consists of tree removal, channel excavation, storm sewer removal, storm sewer installation, and seeding. Bonds required. Prevailing wages.

IDOT Contracts Office
 Login or create an account
 Login or create an account

Owner: State of Illinois Department of Transportation (ILDOT) IL

Published 12/17/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.