ID 735110
Sangamon County
Owner Reference: 93773 |
Bid Date: 01/17/2025 at 12:00pm
26 Days until bid date
Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Earthwork & Paving Contractor: Resurface, Coat, Highway, Roads/Runways Bridges, Overpasses, Asphalt, Land Clearing, Trails/Paths, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron, Tide Gates for Tidal Water - Rivers/Oceans, Roadway Drainage, Stormwater, Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Underdrains, Dewatering, Water Swales, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Traffic Signals & Calming, Intersection Automated Enforcement Systems (AES), Speed Safety Systems & Cameras, Flashing Beacons, High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, Excavation & Grading Contractor: Blasting, Boring, Trenching, Backfill, Digging - General Engineering Contractor
The roadway reconstruction sections consist of the removal of existing pavement including portions of parking lots, curb and gutter, driveway entrances, sidewalk, fencing, abandon utilities and street appurtenances in the existing and proposed rights of way along Ridgely Avenue, Converse Street, North Grand Avenue, 13th Street / Robin Roberts Road, and Enos Avenue. The proposed improvements include drainage structures, storm sewer, sanitary sewer, erosion control items, retaining walls, roadway pavement, curb and gutter, sidewalk, pavement marking, lighting, traffic signals, and fencing. The work includes construction of a bridge and retaining walls carrying a relocated North Grand Avenue over IM and NS Railroads. The railway reconstruction section consists of earth excavation, track removal, and the removal of existing street and parking lot pavement. The proposed improvements include grading, sub-ballast, ballast, trackwork, railroad crossings, drainage items, erosion control, and fencing. It also includes construction of a railroad structure over North Grand Avenue and associated retaining walls. IM and NS work forces will remove existing crossings at North Grand Avenue. NS work forces will extend the siding constructed in usable segment IV southward into the Iles control point. NS forces will replace Iles CP signals that are north of Stanford with a 4-track signal bridge and replace the CP signals south of Stanford. UP work forces will complete track tie-ins and install new RR signals and crossing gates. Project labor agreement. DBE 9%. Bonds required. Prevailing wages.
IDOT Contracts Office
Login or create an account
Login or create an account
Owner: State of Illinois Department of Transportation (ILDOT) IL
Published 12/17/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450