High Friction Surface, US 27, Jessamine, Fayette, and Madison Counties, KY

Jessamine County

Owner Reference: 254707

Bid Date: 03/20/2025 at 10:00am

Trades: Earthwork & Paving Contractor: Resurface, Seal Coat, Milling, Highway/Roads/Runways/Bridges, Asphalt, Land Clearing, Trails/Path, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

Kentucky Transportation Cabinet, Department of Highways, will accept bids for High Friction Surface, US 27 in Jessamine, Fayette, and Madison Counties: Interstate 75 SB ramp 431 (I75 ramp 431) (MP 0.00) HFST on I75 SB ramp 431 (I75 ramp 431) (MP 0.240), a distance of 0.25 miles; Nicholasville Bypass (US 27) (MP 10.685) HFST on Nicholasville Bypass (US 27) (MP 11), a distance of 0.32 miles; Nicholasville Bypass (US 27) (MP 9.771) HFST on Nicholasville Bypass (US 27) (MP 9.868), a distance of 0.10 miles; Nicholasville Bypass (US 27) (MP 9.433) HFST on Nicholasville Bypass (US 27) (MP 9.516), a distance of 0.08 miles; and Interstate 75 ramp 443 (I75 RAMP 443) (MP 0.00) HFST on I75 SB ramp 443 (I75 ramp 443) (MP 0.406), a distance of 0.41 miles. Bonds required. Prevailing wages.

Division of Construction Procurement
 Login or create an account
 Login or create an account

Owner: State of Kentucky Transportation Cabinet (KYDOT) KY

Published 02/28/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.