ID 730303
Lafourche Parish County
Owner Reference: 2023-151
Bid Date: 11/25/2024 at 10:00am
4 Days until bid date
Pre-Bid: 11/18/2024 @ 10:00am
Estimate: $196,000.00
Trades: Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S, Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Construction of a concrete sidewalk along the south side of Bobby Street from Tiger Drive to the intersection of Midland Drive addressing drainage as needed along with all other incidental work items as specified, all complete as indicated in the plans and specifications. The base bid of the project is to include work from Tiger Drive to Sugar Cane Way. Alternate #1 bid is to include work at the intersection of Plantation Road and Tiger Drive. Alternate #2 bid is to include work from Sugar Cane Way to South Barbier Avenue. Alternate #3 is to include work from South Barbier Avenue to Midland Drive. Bonds required. Prevailing wages.
Login or create an accountOwner: City of Thibodaux LA
Published 11/12/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.