CBS ID: 741254
Howard County
Owner Reference: 2025-30
Bid Date: 03/05/2025 at 11:00am
14 Days until bid date
Pre-Bid: 02/04/2025 @ 10:00am
Trades: Sewer Pump System, Sewer Connection, Septic Tanks & Systems Contractor: OnSite Sewage Facility (OSSF); CIPP liners, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Roadway Drainage, Stormwater, Manholes & Valve Boxes, Ditches, Culverts, Shoulder Work, Underdrains, Dewatering, Water Swales
Howard County intends to procure the services of a construction Contractor for the extension of approximately 1,415 linear feet of the existing 8-in sewer along Furrow Avenue, and the replacement of approximately 236 linear feet of exiting 8-in sewer at Twiford Court. The project’s scope includes 6-in and 4-in sewer house connections, manholes, temporary flow bypass, traffic control, surface restoration, and all other appurtenances and incidental items of work as shown in the Contract Drawings and Specifications. Bonds required.
Michael Decker
Login or create an account
Login or create an account
Owner: County of Howard MD
Published 01/29/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.