ID 726504
Hampden County
Owner Reference: 610652-128108
Bid Date: 11/05/2024 at 02:00pm
Estimate: $3,421,000.00
Trades: Earthwork & Paving Contractor, Asphalt, Land Clearing, Path & Trail Construction: General Engineering Contractor, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47
Improvements will consist of the reconstruction of sidewalks along the Maple Street corridor from Begley Street to Walnut Street in the City of Agawam. The project involves the construction of a hot-mix-asphalt shared use path along the north side of Maple Street from Begley Street to the end of Maple Street at Walnut Street. Rectangular Rapid Flashing Beacons will be provided at two crosswalks locations along the Maple Street Corridor. The roadway will be milled and overlaid, providing a new surface wearing course along Maple Street. New sidewalks and pedestrian curb ramps within the project limits will be ADA-compliant. A raised intersection will be constructed at the intersection of Maple Street and Bridge Street and allow pedestrians and bicycles to cross the shared use path and continue along the remainder of the corridor. Bonds required. Prevailing wages.
Jonathan Gulliver
Login or create an account
Owner: Commonwealth and State of Massachusetts Department of Transportation (MassDOT or MADOT) MA
Published 10/15/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450