ID 729277
Jefferson County
Bid Date: 11/12/2024 at 02:00pm
Pre-Bid: 10/30/2024 @ 11:00am
Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
The City of Jefferson is requesting bids to construct a 10-foot-wide concrete trail along the Frog Hollow Branch of Wears Creek from Cavalier Drive to W. Edgewood Drive and a crosswalk at W. Edgewood Drive, including concrete trail and sidewalk, curb and gutter, streambank stabilization, stormwater structures and piping, retaining walls, pedestrian warning lights, signage, striping and other ancillary construction. The project will also include the construction of a sanitary relief sewer along the majority of the trail including 18” and 24” pipe and associated manhole structures. DBE goal 4%. Bonds required.
David Bange
Login or create an account
Owner: City of Jefferson MO
Published 11/04/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.
This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450