Signalized Intersection, ADA Improvement, Coldmill & Resurface - Routes 50 & 19, Multiple Counties, MO

Laclede County

Owner Reference: 241115-D02 | FAF 50-3(112),(117),19-4(26)

Bid Date: 11/15/2024 at 11:00am

Estimate: $20M to $25M

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Traffic Signals, Traffic Calming, Control & Monitoring - Electrical & General Engineering Contractor, Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310

Job J5P3574 Route 50 Osage County. Signalized intersection at Route CC in Linn, the total length of improvement being 0.668 miles. (2): Job JCD0044 Route 50 Gasconade, Osage County. Coldmill and resurface from west of Linn to east of Rosebud, the total length of improvement being 34.734 miles. (3): Job JCD0045 Route 19 Gasconade County. Resurface from Route 50 to Crawford County line, the total length of improvement being 17.621 miles. DBE 5%. Bonds required. Prevailing wages.

Bid Questions
 Login or create an account
 Login or create an account

Owner: State of Missouri Department of Transportation (MODOT) MO

Published 10/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450