Resurface and Add Shoulders - Routes BU 60, ZZ, Scott & New Madrid Counties, MO

Scott County

Owner Reference: 241213-H03 | FAS S704(33)

Bid Date: 12/13/2024 at 11:00am

Estimate: $2.5M to $5M

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors, Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310

Job J9S3722 Route BU 60 New Madrid, Scott County. Resurface and add shoulders from Route 60 to Route 114 near Sikeston, the total length of improvement being 1.278 miles. (2): Job J9S3741 Route BB Scott County. Resurface and add shoulders from Route ZZ to Route 114 near Sikeston, the total length of improvement being 3.817 miles. (3): Job J9S3743 Route ZZ Scott County. Resurface and add shoulders from beginning of state maintenance to Route 61, the total length of improvement being 4.109 miles. DBE 6%. Bonds required. Prevailing wages.

Bid Questions
 Login or create an account
 Login or create an account

Owner: State of Missouri Department of Transportation (MODOT) MO

Published 11/19/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450