ID 732010
Carson City County
Owner Reference: 9429388
Bid Date: 01/07/2025 at 11:00am
16 Days until bid date
Pre-Bid: 12/09/2024 @ 11:00am
Estimate: $ 400,000.00
Trades: C2 - High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, Suppliers
This project is the addition of a new heat trace system for the State Capitol Building to include a heat trace cable system in the existing gutters, downspouts and first twenty-four inches of roof shingles. The system will be controlled via thermostat, controller and moisture sensor. Work sequencing must be coordinated with scheduled events at the Capitol building. Prevailing wages.
Paul Cavin c/o Paul Cavin Architect, LLC
Login or create an account
Login or create an account
Owner: State of Nevada Department of Public Works (NVDPW) NV
Published 11/22/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.