Heat Trace for Gutters and Downspouts - State Capitol Building, Carson City, NV

Carson City County

Owner Reference: 9429388

Bid Date: 01/07/2025 at 11:00am
16 Days until bid date

Pre-Bid: 12/09/2024 @ 11:00am

Estimate: $ 400,000.00

Trades: C2 - High Voltage Electrical Contractor (HVE): Transmission Lines, Power Lines, Venues, Arenas, Utility, Transformers, Suppliers

This project is the addition of a new heat trace system for the State Capitol Building to include a heat trace cable system in the existing gutters, downspouts and first twenty-four inches of roof shingles. The system will be controlled via thermostat, controller and moisture sensor. Work sequencing must be coordinated with scheduled events at the Capitol building. Prevailing wages.

Paul Cavin c/o Paul Cavin Architect, LLC
 Login or create an account
 Login or create an account

Owner: State of Nevada Department of Public Works (NVDPW) NV

Published 11/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.