ID 729179
Clark County
Owner Reference: 25-0895
Bid Date: 11/20/2024 at 03:00pm
Estimate: $4,574,000
Trades: C1F - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's, Class B - *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors
The summary of work includes a turn-key project to include the replacement of the North Las Vegas Campus C Building Air Handler Unit 4 and Chillers. See Plans Bid Attachment 4 for full description. Summary as follows: The purpose of the project for Building C is to provide a new local central plant for the chilled water for the building and to replace AHU-4 with a new air handler with hydronic heating and cooling coils. The existing hydronic heating and cooling systems inside the building are connected to both a remote central plant and two temporary air-cooled chillers outside the building. The temporary chillers are to be disconnected and given back to CSN. Bonds required. Prevailing wages.
Annette Lord
Login or create an account
Login or create an account
Owner: College of Southern Nevada (CSN) NV
Published 11/03/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.