Subcontractor Opportunities; Henderson Justice Court, Cooling Tower Replacements, Henderson, NV

Clark County

Owner Reference: 124-25

Bid Date: 11/27/2024 at 01:00pm
6 Days until bid date

Pre-Bid: 11/12/2024 @ 10:00am

Trades: C1F - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Exhaust Systems, Air Handler/Air Chillers. Includes RTU's, Evaporative Cooling Contractor

A. Contractor shall perform all Work and provide all labor, equipment, materials, transportation, engineering and supervision necessary to remove and replace two (2) cooling towers and associated equipment at the Henderson Justice Court. The project scope includes, but is not limited to, the following: a. Contractor Responsibilities i. Removal and proper disposal of existing towers, pumps, associated equipment, piping, etc. Coordination of afterhours crane service for the removal of the existing cooling towers and installation of the new towers. Crane and street closure/traffic plan must be approved by the City’s Project Manager in advance. b. Provide and set up of temporary cooling tower to maintain continuous operation. c. Provide 2- bray control valves in condenser piping at existing location. d. Existing tower stand modifications to match manufacturers recommendations, including all engineering. e. Transport of City supplied towers and equipment from 486 Gibson Ave, Henderson, Nevada, to job site location at the time of crane set. f. Alteration of existing housekeeping pads to accommodate new pumps. g. Abandon underground power piping on pumps and run overhead to match existing pump. h. Installation of new sand separator system including p Prevailing wages.

Luke Fritz
 Login or create an account
 Login or create an account

Owner: City of Henderson NV

Published 11/13/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.