SR 163, Phase 2 - Sediment Basin, Clark County, NV

Clark County

Owner Reference: 607316-24

Bid Date: 12/16/2024 at 02:15pm
22 Days until bid date

Pre-Bid: 12/02/2024 @ 10:00am

Estimate:  $1,604,455 - $1,773,345

Trades: C1F - HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Exhaust Systems, Air Handler/Air Chillers. Includes RTU's, Framing, Rough Carpentry Contractor & Sheathing, C4 - Painting Contractor: Exterior/Interior Finish, Decorating; Interior Wallpaper & Wall Coverings, *Landscaping Contractor: Grounds Weed Control Grubbing Fertilizing Sodding Lawn Mowing Rooting Mulch Hardscaping Rockscaping, C16 - Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl, *Janitorial, Building Cleaning, Custodian, Housekeeping, Window/Floor/Office Cleaning, Deodorizing Services, Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors, Stormwater Prevention Plan (SWPP), Regional Flood Planning Group (RFPG), Floodproofing & Flood Risk/Pollution Reduction

The work to be performed under this Contract is for the construction of a sediment control facility in Laughlin, Nevada. The work will generally consist of flood control improvements consisting of excavation of a sediment basin, energy dissipation devices, concrete channel lining, storm drain facilities, and maintenance access; traffic control, dust control, and storm water pollution control; appurtenances and miscellaneous improvements as shown on the drawings; and other related items of work as specified and shown on the drawings.

Purchasing
 Login or create an account

Owner: County of Clark NV

Published 11/14/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.