Cox Pavilion Reroof Project, Las Vegas, NV

Clark County

Owner Reference: 5537-HE

Bid Date: 01/09/2025 at 02:00pm
18 Days until bid date

Pre-Bid: 12/19/2024 @ 09:00am

Estimate: $250,000

Trades: Class B - *General Building Contractor GBC: Building Construction Services, Enclosed Structures; Opportunities for Subcontractors, C-15 - Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts

To install: An attached 80 mil single-ply PVC roofing membrane utilizing Rhinobond attachment including flashings and other components, to comprise a roofing system for the structure of interest. 1. The existing Single Ply roofing system is to be removed down to the existing metal deck. 2. Existing equipment curbs and walls are to be flashed with 60 mil PVC membrane. New equipment curbs are to receive 60 mil PVC fiberglass-reinforced flashing membrane. 3. Provide and install a new layer of 3.3”/R19 polysio insulation (tapered insulation where required) and one new layer of ½” Dens-deck roof board is to be mechanically fastened directly to the substrate using #15 Fasteners and Rhinobond plates in accordance with Section 3.05 of this specification. 4. Provide and install a new 80mil PVC, polyester-reinforced, PVC membrane, it is to be welded to the new Rhinobond plates in accordance with Section 3.06 of this specification. 5. The color of the membrane is to be EnergySmart White. Install a new clad metal detail at perimeter edge where required per the following specification and detail requirements. Install per PVC manufacturer’s detail and installation requirements. 6. Install new surface mounted counter flashing where required. Install per PVC manufacturer’s detail and installation requirements. 7. At all A/C or Mechanical unit access areas, install new Tred walkway. Install per PVC manufacturer’s recommended detail and installation requirements. 8. Flash each penetration with a cone flashing membrane per PVC manufacture’s standard written and detail requirements. Any and all pitch pans are to removed and each penetration flashed individually. 9. Flash new scuppers with new pvc clad metal per PVC manufacturer’s standard written and detail requirements. 1. 10. A 20 Year Systems Warranty shall be provided to the Owner upon completion as described in Section 1.0 of this specification Bonds required. Prevailing wages.

Henry Enriquez
 Login or create an account
 Login or create an account

Owner: University of Nevada Las Vegas (UNLV) NV

Published 12/10/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450