Rehabilitation of Camden City Swimming Pools, Various, Camden, NJ

Camden County

Owner Reference: 25-01

Bid Date: 01/14/2025 at 11:00am
18 Days until bid date

Pre-Bid: 01/02/2025 @ 11:00am

Trades: *General Building Contractor GBC: Building Construction Services, Enclosed Structures; Opportunities for Subcontractors, General Swimming Pool Contractor

The City of Camden solicits bids for the rehabilitation of the City's swimming pools. Summary of Work (Base Bid plus One Alternate): Base Bid - North Camden Pool at North Camden Community Center and South Camden Pool at Isabel Miller Community Center. North Camden Pool at North Camden Community Center 1. Before any work is to be done on-site, Contractor must pressure test main drain line and confirm drain line is compromised. 2. Remove and replace existing pool deck and pool wall/floor 3. Remove and replace skimmer(s) and associated plumbing 4. Remove and replace areas of shell voids/hollow spots for re-plastering. Existing plaster to be chipped back for full depth coating at all tile lines and boarders. 5. Remove and replace pool tile as specified in Contract Documents. 6. Contractor to replace main drain sumps and piping to and within filter building 7. Install new main drain, pipes, fittings, and associated plumbing requirements 8. Install new ADA lift chair with 24-volt rechargeable battery as per manufacturer requirements. 9. Entire pool shell to be remediation, bond coated, and re-plastered in white diamond brite or approved equal. Prior to bond coating and plaster, existing plaster to be chipped back for full depth of coating at all tile lines and borders. Weak of loose plaster to be removed. 10. Restoring disturbed vegetated/lawn areas. As a minimum, all lawns shall be restored with topsoil, fertilizer, seed, and mulch. Other materials shall be restored in-kind. 11. Contractor to completely clean site at completion of construction and have pool ready for water. South Camden Pool at Isabel Miller Community Center 1. Remove and replace existing pool deck 2. Remove and replace skimmer(s) and associated plumbing 3. Install new ADA lift chair with 24-volt rechargeable battery as per manufacturer requirements. 4. Restoring disturbed vegetated/lawn areas. As a minimum, all lawns shall be restored with topsoil, fertilizer, seed, and mulch. Other materials shall be restored in-kind. 5. Contractor to completely clean site at completion of construction and have pool ready for water. Bonds required. Prevailing wages.

Lateefah Chandler
 Login or create an account
 Login or create an account

Owner: City of Camden NJ

Published 12/15/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.