Patriots Park Comfort Station Project, Cameron, NC

Harnett County

Bid Date: 04/03/2025 at 03:00pm
19 Days until bid date

Trades: *General Building Contractor GBC: Building Construction Services, Enclosed Structures; Opportunities for Subcontractors, Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47, Earthwork & Paving Contractor: Resurface, Seal Coat, Milling, Highway/Roads/Runways/Bridges, Asphalt, Land Clearing, Trails/Path, Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing, Sewer Pump System, Sewer Connection, Septic System Contractor: OnSite Sewage Facility (OSSF)

Site work including sidewalk and asphalt parking pad. Project scope includes the construction of a restroom facility at Patriots Park. Bathroom Facility must be fully ADA compliant. Septic system has not yet been permitted. Preliminary design is a 1000-gallon septic tank with a 1000-gallon pump tank to be pumped approximately 50 feet to a conventional or accepted system (final footage yet to be determined).

Renea Warren-Ford
 Login or create an account
 Login or create an account

Owner: County of Harnett NC

Published 03/01/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.