ID 725415
Mitchell County
Bid Date: 10/31/2024 at 05:00pm
Trades: Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing, *General Building Contractor GBC: Building Construction Services; Opportunities for Subcontractors, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Grade 3 - Wastewater Operator Certification: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Stat, Pipeline Contractor: Water Mains, Water Lines, Sewer Lines + Related Structures; Includes Pipe Inspection Camera , A Surface - Public Water System Contractors & Operators
Background: The Town of Spruce Pine has a population of 2,220 people. The Spruce Pine Wastewater Treatment Plant is a 2.0 MGC wastewater treatment facility that serves Spruce Pine and main corridors leaving Town limits. In 2023, the Plant treated an average daily flow of 611,000 gallons per day. The treatment plant includes the following components: influent pumping; automatic bar screen; teacup grit removal system; three ring oxidation ditch; two final clarifiers, one emergency clarifier; chlorination/de-chlorination system; two aerobic sludge digesters. Discharge from the plant enters the North Toe River, a class C Trout water in the French Broad River Basin. The sewer system has fourteen lift stations. The Town has one industry, BRP Recreational Products on a modified pretreatment permit program. The Contractor will be responsible for the sampling & inspection process. The Town of Spruce Pine is the POTW enforcement. The Town of Spruce Pine’s water system has a permitted treatment and storage capacity of 1.6 million gallons, and a 2023 average use of 1.20 million gallons per day (MGD). Beaver Creek Reservoir is the primary water source for the Town and is located at the headwaters of Beaver Creek. The North Toe River supplies additional water through an intake located just upstream of the US19E Bridge in Avery County. The system also includes Carter’s Ridge Wells located on Carter’s Ridge Road as sources of ground water available to the Town of Spruce Pine during times of high consumption. The water system has five pump stations. The plant also has a certified lab. We currently have 1 fulltime manager, three wastewater employees, and four water employees. The water plant requires an A surface license, and the wastewater plant requires a Grade 3 biological license. Town staff are responsible for the distribution and collection system excluding the lift and pump stations.
Darlene Butler
Login or create an account
Login or create an account
Owner: Town of Spruce Pine NC
Published 10/07/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.