HVAC Replacement at Bingham Facility, Chapel Hill, NC

Orange County

Owner Reference: 287-24-18836-01

Bid Date: 02/07/2025 at 05:00pm

Pre-Bid: 01/24/2025 @ 01:00pm

Estimate: $2,000,000

Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Exhaust Systems, Air Handler/Air Chillers. Includes RTU's

Bingham Facility 2 is currently served by two 100% outside air DX cooling/propane gas heating units located on the building roof. The units were designed to condition 8000 CFM to maintain an indoor temperature to 70-74F. This project will replace the current systems with a system to be able to maintain required conditions. The new system will include design and installation of a new air-cooled chiller and a new propane hot water boiler as part of this project.

Kyle Hawkins
 Login or create an account
 Login or create an account

Owner: University of North Carolina Chapel Hill (UNCCH) NC

Published 01/16/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.