ARPA Stormwater Improvements Project Phase 2, Indian Trail, NC

Union County

Owner Reference: 10-40-001

Bid Date: 10/30/2024 at 01:00pm

Pre-Bid: 10/21/2024 @ 02:00pm

Trades: *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Ditches, Culverts, Shoulder Work, Underderdrains, Dewatering, Road S

This project consists of replacing three (3) inline culvert crossings in the Clover Bend subdivision, and a channel improvement in the back of the Ashland subdivision near Liberty Lane. This work will also include active shoring, erosion control, water/sewer relocations, pavement repair, and landscaping. DBE Goal: 5% Bonds required. Prevailing wages.

Todd Huntsinger
 Login or create an account
 Login or create an account

Owner: Town of Indian Trail NC

Published 10/04/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450