State Street Water and Sewer Improvement Project - Phase 3, Raleigh, NC

Wake County

Owner Reference: WS-2020-77

Bid Date: 04/22/2025 at 02:00pm
35 Days until bid date

Pre-Bid: 03/26/2025 @ 10:00am

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras, Light Grading - General Engineering Contractor, Erosion Control: Bank Stabilization, Straw Bombing, Earth, Soil, Sand & Beach Replenishment, Earthwork & Paving Contractor: Road Resurface, Seal Coat, High Friction Treatment, Milling, Asphalt, Land Clearing, Trails/Path

The Project consists generally of the following major items: • Installation of approximately 7,510 linear feet of 6-inch to 16-inch diameter waterlines located along the alignment, valves and all other appurtenances as shown on the Drawings and as specified. • Abandonment of existing 6-inch waterlines as shown on the Drawings and as specified. • Reconnection to existing 12” – 16” waterlines as shown on the Drawings and as specified. • Installation of approximately 6,940 linear feet of 8-inch sewer lines located along the alignment and associated manholes as shown on the Drawings and as specified. • Abandonment of existing 6-inch sewer lines as shown on the Drawings and as specified. • Installation of approximately 8,760 linear feet of 6-inch to 10-inch sewer CIPP liner located along the alignment and associated manholes as shown on the Drawings and as specified. Advertisement for Bids Raleigh Water 00100-1 • Installation of approximately 1,220 linear feet of 4-inch to 12-inch water cementitious liner located along the alignment and associated manholes as shown on the Drawings and as specified. • Replacement of existing active sewer laterals connected to sewer lines to be replaced and installation of new proposed sewer laterals as shown on the Drawings and as specified. • Reconnection of existing fire services as shown on the Drawings and as specified. • Grading, paving, erosion control, site cleanup, and seeding. • Disposal of excess and unsuitable excavation and removed excess materials. • Testing of all installed water and sewer infrastructure. • Temporary facilities (including bypass pumping and temporary water) as required to maintain service during construction and connection to the new facilities. • General conditions including scheduling, project coordination, field work and surveying, environmental protection procedures, submittals and shop drawings, operations and maintenance data, and other requirements as specified for the coordination and execution of the Work. Bonds required.

Todd D. Toler
 Login or create an account
 Login or create an account

Owner: City of Raleigh NC

Published 03/11/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.

DBE/HUB Outreach

This project requires a Good Faith Effort (GFE) outreach. For information regarding Construction Bid Source performing a GFE for you, please call us toll free at 1-888-786-9450