New Cardlock Fuel Facility, Canby, OR

Clackamas County

Bid Date: 12/12/2024 at 02:00pm

Pre-Bid: 12/05/2024 @ 11:00am

Trades: Fuel Management Services & Systems, Fuel System Repairs & Lubricant Equipment, Tank Services: Installation & Cleaning, Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor, *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors

The scope of work generally consists of a Cardlock Fuel Facility with two 12,000-gal Gasoline and one 12,000-gal Diesel UL 2085 tanks. The fuel islands will have an oversize canopy, a two hose gasoline dispenser, two hose diesel dispenser, a 500 gallon DEF tank and dispenser, water supply and compressed air hose reel. Slab drainage will be pumped to an existing oil water separator.

Don Hardy, Planning Director (via email only)
 Login or create an account
 Login or create an account

Owner: City of Canby OR

Published 11/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.