Bilquist Elementary School Sidewalk Construction Project, Portland, OR

Clackamas County

Owner Reference: 2024-107

Bid Date: 01/08/2025 at 02:00pm
5 Days until bid date

Estimate: $2,496,568.00

Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors

Clackamas County DTD obtained Safe Routes to School (SRTS) funds through ODOT to provide bicycle lanes and sidewalk improvements on Webster Rd from Roots Rd to Bilquist Elementary School. The existing street lacks these facilities, and they are needed to provide safe routes and important connections to the Bilquist Elementary School. Additional improvements will include upgraded storm water conveyance and management facilities, ADA curb ramps, and an enhanced crosswalk at Bixel Way. The anticipated schedule is for substantial completion by December 31, 2025, with a 1-year plant establishment period ending December 31, 2026. Road improvements will also include mobilization, temporary traffic control, construction survey, permanent signing and striping, base work, shoulder construction, grading, permanent seeding, and asphalt concrete pavement wearing surfaces. Bonds required. Prevailing wages.

Tralee Whitley
 Login or create an account
 Login or create an account

Owner: County of Clackamas OR

Published 12/10/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.